Green Civils Ltd delivers safe, compliant streetworks and highway reinstatement services for energy infrastructure and utility-related civil engineering projects across the UK. Whether works are linked to EV charging, LV/HV power connections, solar, battery storage, or wider civils packages, we ensure excavations and reinstatements are completed to the required standards with minimal disruption and a strong focus on safety, quality, and programme delivery.
Our teams are experienced in working within public highways, footways, and live environments where compliance, traffic management coordination, and tidy handover standards are essential. From excavation and temporary reinstatement through to permanent finishes, we deliver reinstatement works in line with NRSWA and HAPAS requirements (where applicable), including surfacing, kerbing, edging, and associated civils. We work closely with principal contractors, utilities, and site teams to make sure reinstatement is completed correctly first time and aligned with project deadlines.

Yes. We can deliver temporary reinstatement where required for phased works, followed by permanent reinstatement once final works are complete.
Yes. Our streetworks and reinstatement works are completed in line with relevant NRSWA requirements and project specifications.
Yes. We carry out reinstatement across a range of surface finishes, including tarmacadam, concrete, block paving, footways, carriageways, and hardstanding areas.
We commonly deliver reinstatement as part of wider civils packages, but we can also support reinstatement-focused scopes depending on the project requirements.
Yes. We can replace or make good kerbs, edgings, and related surface details as part of the reinstatement package.
Yes. We regularly work in live and public-facing environments and plan works carefully to maintain safe access and minimise disruption.
Yes. We regularly reinstate around duct runs, joint bays, POCs, feeder pillar locations, and other infrastructure linked to EV and utility connection works.
We typically need the site location, scope of works, drawings/specification, surface types, reinstatement requirements, and target programme dates. Photos and traffic management details are also useful where available.